Sök:

Sökresultat:

4541 Uppsatser om Production planning - Sida 1 av 303

Utvärdering av ett optimeringsprogram för produktionsplanering.

The aim of this thesis is benchmarking of the program, based on dynamic programming, that earlier was written to imitate the Production planning at TSS.This thesis starts with a chapter about the construction of the DP-program, a shorter description of one and each of the program parts and also a list over the in- and output data in each program part. The DP-program consists of six linked MATLAB-files that together produce an optimized production plan for the different planning groups at TSS. The program reads in and reformat the given data and optimize the production of the articles in one group. Finally it compounds all article production plans and give us a production alternative.After running the program with new data the result shows, resembling with previous results, that TSS could be able to make some distinct cost-savings. According to the program, a 50 % decrease of TSS production costs is possible. .

Planeringsverktyg för ABB Capacitors : Planering av körsekvens

ABB Capacitors is looking to introduce LEAN within their organization. The purpose of this research is to suggest ways to improve the Production planning in order to facilitate the company?s production processes. This should be done in accordance with the LEAN concept.Today, ABB will produce two of the customers? orders at the same time.

Studie av planerings- och produktionsprocess i sågverksbranschen

 The sawmill industry is a relative fragmented industry that is in an economic upswing andwith a hard competition. The customers have high demands on their suppliers and the highcustomer demand make it necessary for the companies to make a streamlining in planningand production. For that reason it is very important that the planning- and productionprocesses aren?t to complex and with a simple structure.The purpose of this report is to study and map out a marked out part of a planning- andproduction process, from adjust works to final delivery, at a company in the sawmill industry.Different methods have been used for the report, among others interviews and subordinatedmaterial.We have mapped out a marked out part of the planning- and production process at theCompany. This part we have studied, and we have analysed the process it self and otherthings connected to the process.We see the planning- and production process in the Company as complex.

Effektiv Planering enligt Lean Production : En fallstudie på Sandvik Mining and Construction

Due to a constantly increasing competitive pressure it is of great importance to constantly strive for improvements in order to gain competitive advantages. Lean Production is a concept that has been introduced with the aim to minimize waste and increase profitability. The purpose of this report is therefore to investigate how to perform effective planning according to the principles of Lean Production, in companys with customer exclusive products, through a case study at Sandvik Mining and Construction (SMC), and to investigate how SMC kan improve their planning of drifting rods at the production unit in Sandviken.The study started by creating a theoretical framework, to describe the subject planning and planning based on Lean Production. This frame work constituted the base for the case study which took place at Sandvik Mining and Construction, and also for the model and planning tool that has been introduced.The result of the study is partly a general model with factors that contribute to a more effective planning. These factors has beed identifed as SMED, which focuses on reducing set up times and in the end to facilitate the planning.

Undersökning av metoder för att analysera och modellera efter stora datamaterial, hantering av programmet SPSS samt en studie i Kronoberg läns gymnasieelevers psykiska ohälsa

 The sawmill industry is a relative fragmented industry that is in an economic upswing andwith a hard competition. The customers have high demands on their suppliers and the highcustomer demand make it necessary for the companies to make a streamlining in planningand production. For that reason it is very important that the planning- and productionprocesses aren?t to complex and with a simple structure.The purpose of this report is to study and map out a marked out part of a planning- andproduction process, from adjust works to final delivery, at a company in the sawmill industry.Different methods have been used for the report, among others interviews and subordinatedmaterial.We have mapped out a marked out part of the planning- and production process at theCompany. This part we have studied, and we have analysed the process it self and otherthings connected to the process.We see the planning- and production process in the Company as complex.

BIM i planeringsarbetet : Effective planning by using BIM

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

Utveckling av handtag till spolarvätska

Title Becoming involved in the planning process - from the construction workers perspective.University/Institution Halmstad UniversityKeywordsEmpowerment through participation, construction workers involvement in decision making in the planning process, knowledge management and communication in the planning process, partnering, human resource managementAimThe aim of this bachelor thesis is to provide knowledge and examine how construction workers perceive involvement in the planning process of partnering projects, what they can contribute and what they get out of the planning process.Methodology The study was conducted with a qualitative approach in the form of semi-structured interviews.          The interview studie consist of 10 interviews with construction workers who are specially educated in participating in the planning process at the company ByggDialog AB.ConclusionAll respondents are positive to be involved in the planning process. The main advantages they can see is that they are able to influence technical solutions and methods that will be used later on in the production. Therefore it is important to consider when construction workers should be involved in the planning process so that they get the chance to influence in this decisions.When it comes to the decision making the construction workers should be involved in the decisions that are related to their tasks in the production such as technical solutions, choice of methods and materials. Their main duties and working hours should be in the production.Involvement in planning does not automatically mean that the construction workers are involved in the decision making, it is up to them how much they participate.

Kostnadsuppföljning avproduktionskalkyler

Calculations are an important part of planning around a construction project. From concept to completion of the project calculation is a tool to try to predict the actual cost. During the production stage in particular, deviations occur which makes the actual cost different from the calculations.This thesis is done in collaboration with JM Residential Stockholm. The study includes a cost follow-up in which a comparison was made between the calculated production cost and actual cost for the five projects. The aim of the study was to observe the most common reasons that a project deviates from the calculated production cost and then summing these causes in a number of categories.

?Vård i annans hem? - användning av arbetsmaterialet i Huddinge kommuns hemtjänst/boendestöd och personlig assistans

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

Planering & produktionsstyrning : Lean filosofin vid produktion av asfalt

Lean is a production philosophy which is about increased resource use while meeting customer requirements. The foundation of lean comes from Toyota and their production philosophy The Toyota Way. Professor Jeffrey k. Liker has worked with Toyota's production philosophy and Lean for a long time and has created a 4 P model and 14 principles that characterize the Toyota production system (TPS), which many sources refer to.The aim of my work is to study the working procedure of asphalt projects from sales to the laid asphalt with a focus on planning and production management. The goal is to examine how the lean philosophy can be applied in planning and production to simplify the flow of asphalt projects based on Likers model and principles.

Ett planeringsverktyg för TV-postproduktion

This report describes the process of outlining a design proposal for a resource planning tool for TV post-production. A feasibility study in form of a participant observation has been carried out on-site, which has resulted in a requirement specification. Based on the requirement specification, mockups have been created to illustrate the functions and features that a final planning tool should have. In addition to developing a design proposal, an evaluation of the existing resource planning tool Ganttic has been conducted. Ganttic has been reviewed based on how well it meets the list of requirements.

Byggnadsarbetarens syn på att bli involverad i projekteringen : En intervjustudie i byggprojekt

Title Becoming involved in the planning process - from the construction workers perspective.University/Institution Halmstad UniversityKeywordsEmpowerment through participation, construction workers involvement in decision making in the planning process, knowledge management and communication in the planning process, partnering, human resource managementAimThe aim of this bachelor thesis is to provide knowledge and examine how construction workers perceive involvement in the planning process of partnering projects, what they can contribute and what they get out of the planning process.Methodology The study was conducted with a qualitative approach in the form of semi-structured interviews.          The interview studie consist of 10 interviews with construction workers who are specially educated in participating in the planning process at the company ByggDialog AB.ConclusionAll respondents are positive to be involved in the planning process. The main advantages they can see is that they are able to influence technical solutions and methods that will be used later on in the production. Therefore it is important to consider when construction workers should be involved in the planning process so that they get the chance to influence in this decisions.When it comes to the decision making the construction workers should be involved in the decisions that are related to their tasks in the production such as technical solutions, choice of methods and materials. Their main duties and working hours should be in the production.Involvement in planning does not automatically mean that the construction workers are involved in the decision making, it is up to them how much they participate.

Analys av verkstadsplaneringen : på Fläkt Woods i Jönköping

This paper is finishing part of the two-year master programme in Industrial Engineering and Management.Initially there was an inquiry of studying the queue-times that Fläkt Woods uses when they break down internal working orders. These times were assumed to be too generalised and does not apply to the actual value of the queue-times which generates incorrect data and delivery delays. During the work of this paper it has been established that it is not the queue-times that is the biggest problem. The problem is the shop floor control and the lack of manufacturing the right products at the right time. Therefore an analysis of the Production planning process was made to bring forward the real problems.

Utformning av ett materialflödessystem anpassat för HSP-Gripens produktion

Like many small-time companies there is a need to improve the flow of materials at HSP-Gripen AB. The company develops and manufactures hydraulic-powered grapples for the machine- and forest industry. By mapping the material flow in the current production and gathering necessary data, suggestions on how different parts of the production could be controlled is presented in this dissertation. This has been achieved by the study of relevant scientific literature. The suggested ways of controlling the production consist of 2-bin systems, hybrid material flow system as well as a cyclic product-planning.

Resource planning for internal logistics : A tool designed for the material handling department at Scania Axles and Gearboxes

This master thesis is performed at Scania Axles and Gearboxes, a production plant located in Södertälje. Within the plant axles, gearboxes as well as central gears are assembled from components to finished products. All production is conducted on production lines, with a pre-determined rate, which is supplied with components by the material handling department. Since the production quantity and the mix of product variants produced on the production line is customer order-based, the number and type of components needed for production as well as appropriate staffing within the material handling department is difficult to predict. Scania is currently using a number of different resource planning tools for each material handling-department within Axles and Gearboxes to visualize the workload within the departments.

1 Nästa sida ->